Standard predetermined overhead rate Standard predetermined overhead rate is an overhead rate determined by dividing budgeted overhead costs by an expected standard activity index.
Predetermined overhead rate The predetermined overhead rate is a rate that based on the relationship between estimated annual overhead costs and expected annual operating activity.